ANALYSIS OF A01 RAW MATERIAL REQUIREMENT PLANNING USING THE LOT SIZING WAGNER WITHIN, LOT FOR LOT, AND PERIOD ORDER QUANTITY
Keywords:
ARIMA, Material Requirement Planning, LFL, POQ, Wagner WithinAbstract
PT. XYZ is engaged in manufacturing painting which produces various types of decorative paints. One of the products with the highest sales capacity is CK ABC 901; The main raw material in producing this CK ABC 901 is A01 with a total usage of 35.85%. The main raw material greatly affects most of the production process. The problem faced by the company is the absence of resources which control the inventory of raw materials every month. Thus it causes the purchase of raw materials not in accordance with consumer demand and causes problems at the costs that should be minimized. Therefore, the company needs to control the supply of the raw materials so that the production process. One of the methods used in overcoming
company problems is Material Requirements Planning with data processing obtained from ARIMA forecasting results using the Crystal Ball application. Forecasting results are used as input in determining the amount of raw material or lot size which needs to be provided to carry out the production process. This research focuses on lot sizing method of LFL, POQ and Wagner Within to get the minimum total cost of inventory. The results of calculations using the MRP method obtained that the total cost of raw material inventory using the technique of the lotting algorithm of Wagner Within is Rp. 1,967,376. Where the fulfillment of raw materials is carried out 6 times, namely December 2020, February, March, April, June, August and October 2021 with a total order of 4399 Kg, 3697 Kg, 3358 Kg, 3173 Kg, 3836 Kg, and 4242 Kg.
Downloads
References
Stevenson, W.J. and S.C. Chuong, Asian perspective operations management. Jakarta: Salemba Empat, 2014. 9.
Anggriana, K.Z., Analysis of busbar inventory planning and control based on the mrp (material requirement planning) system at pt. tissue. Penelitian Dan Aplikasi Sistem Dan Teknik Industri, 2015. 9(3): p. 182837.
Sofyan, D.K., Production planning and control. Yogyakarta: Graha Ilmu, 2013. 7(8).
Luo, Q., et al., Effects of Integrated Health Education Combined with Life Intervention on Patients with Coronary Atherosclerotic Heart Disease Complicated with Hyperlipidemia. American Journal of Health Behavior, 2021. 45(5): p. 843-848 DOI: https://doi.org/10.5993/AJHB.44.6.7.
Alam, W.P., PLANNING OF RAW MATERIAL INVENTORY WITH MRP (MATERIAL REQUIREMENT PLANNING) METHOD IN A STAR DUA ALUMINUM CAS COMPANY IN KEC. CIKONENG KAB. CIAMIS. 2019. 3(5): p. 76-87.
Chamidah, N. and T.A. Auliandri, Inventory Analysis of Concrete Production Raw Materials with Material Requirement Planning (MRP) Method at PT. Merak Jaya Concrete Plant Kedung Cowek Surabaya. INOBIS: Jurnal Inovasi Bisnis dan Manajemen Indonesia, 2019. 2(4): p. 505-512 DOI: https://doi.org/10.31842/jurnal-inobis.v2i4.108.
Surianto, A., The application of the material requirements planning (MRP) method at PT. MOJOKERTO BOKORMAS. Jurnal Ilmiah Mahasiswa FEB, 2012. 1(2).
Mantey, D.S., et al., Positive Affect and Multiple-tobacco Product Use among Youth: A 3-year Longitudinal Study. American Journal of Health Behavior, 2021. 45(5): p. 849-855 DOI: https://doi.org/10.5993/AJHB.45.5.5.
Sari, S.M., H. Suyanto, and H. Tannady. Proposed control of raw material inventory for perfume products using the lot sizing method (Case study: CV Garcia Fantasy). Seminar Nasional Akuntansi dan Bisnis (SNAB), Fakultas Ekonomi Universitas ….
Astana, I.N.Y. and I. Nyoman, Raw material inventory planning based on the MRP (Material Requirements Planning) method. Jurnal Ilmiah Teknik Sipil, 2007. 11(2): p. 184-194.
Maison, Y. and J. Robecca, Product Inventory Control Analysis with Economic Order Quantity Method and Wagner-Within Algorithm at PT. Herbalife SC Bandung. Bandung: Indonesian Computer University. 2016. p. 71-80.
Muchimba, M., Age of Substance Use Initiation and Sexual Violence Victimization among Female Adolescents. American Journal of Health Behavior, 2020. 44(6): p. 840-847 DOI: https://doi.org/10.5993/AJHB.44.6.8.
Nasution, A.H., Production planning & control. 2003. 45(7).
Fatma, E. and M. Fitriana, Component Inventory Planning in Original Equipment Manufacturer Company Using Dynamic Deterministic Inventory Method. Spektrum Industri, 2019. 17(1): p. 23- 30 DOI: https://doi.org/10.12928/si.v17i1.9354.
Rahmadayanti, R., B. Susilo, and D. Puspitaningrum, Comparison of the Accuracy of Autoregressive Integrated Moving Average (ARIMA) and Exponential SMOOTHING Methods in Forecasting Cement Sales at PT. Eternal Light. Rekursif: Jurnal Informatika, 2015. 3(1).
Salwa, N., et al., Bitcoin Price Forecasting Using the ARIMA (Autoregressive Integrated Moving Average) Method. Journal of Data Analysis, 2018. 1(1): p. 21-31 DOI: https://doi.org/10.24815/jda.v1i1.11874.
Owotomo, O. and J. Maslowsky, Adolescent E-cigarette Users at Highest Risk of Cigarette Smoking Intention. American Journal of Health Behavior, 2021. 45(4): p. 711-722 DOI: https://doi.org/10.5993/AJHB.45.4.10.
Lestari, S. and D.D. Nurdiansah, Analysis of material requirements planning in paper manufacturing companies using the Material Requirements Planning (MRP) method. Jurnal INTECH Teknik Industri Universitas Serang Raya, 2018. 4(2): p. 59-64.
Krajewski, L.J. and L.P. Ritzman, Operations management: strategy and analysis. Vol. 120. 2002: Prentice Hall Upper Saddle River, NJ.
Hansa, A.P.A., Application of Period Order Quantity (POQ) Method in Support Applications for Optimizing Inventory of Fabric Raw Materials at UD. Dwidaku Jaya. 2015. 6(7).
Khan, T., et al., Statistical analysis and temporal trend of annual maximum temperature with teleconnection patterns of different stations in Pakistan. Arabian Journal of Geosciences, 2021. 14(15): p. 1-13.
Leal, I.M., et al., Adapting and Evaluating Implementation of a Tobacco-Free Workplace Program in Behavioral Health Centers. American Journal of Health Behavior, 2020. 44(6): p. 820-839 DOI: https://doi.org/10.5993/AJHB.44.6.7.
Tersine, R.J., Principles of inventory and materials management. 1994. 3(2): p. 21-22.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Author
This work is licensed under a Creative Commons Attribution 4.0 International License.
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.